| We were so pleased when the Academy of Handmade asked us to write about why we love to sell on Instagram, and review Sue B. Zimmerman's workshop on Creative Live. Read about it all here ~> http://bit.ly/AcademyofHandmade If you have a story about where you like to sell your handmade goods, or if you just love Instagram like me, leave a comment below! |
- Step 1: Confirm Installation Conditions, Not Just Product Specs
- Step 2: Verify Load-Bearing Requirements (Even for Decorative Pieces)
- Step 3: Budget for Shipping Damage and Unpacking Time
- Step 4: Match the Color and Profile Across Multiple Orders
- Step 5: Review the Hardware and Attachment Method
- One More Thing: The 'Stained Glass' Detail Trap
- Wrapping It Up: The Cost of Skipping These Checks
I'm a project manager handling material orders for a mid-sized remodeling crew, been doing it since 2017. In my first year, I made a $3,200 mistake on an order for PVC column wraps because I didn't double-check the load-bearing specs. That was the first of a few expensive lessons. I've personally made—and documented—seven significant ordering errors since then, totaling roughly $6,800 in wasted material, re-dos, and delays. Now I maintain our team's pre-order checklist. This article is that checklist.
This is for anyone ordering exterior PVC millwork for the first time or looking to tighten up their process. I'm assuming you've already chosen Fypon or a similar system for a project. What I'm gonna walk you through is the five-step check I run before every single order now. If you skip one of these, you're gambling with your budget and timeline.
Here are the five checks I use on every order:
Step 1: Confirm Installation Conditions, Not Just Product Specs
This is the one that bit me early on. You look at a product page, see the dimensions match your rough opening, and think you're good. But the installation conditions—the actual environment you're putting the piece into—can change everything.
In March 2022, I ordered a set of window headers for a dormer addition. The spec sheet said 36-inch width, which matched the window. What I didn't check was the existing flashing detail. The homeowner had a weird metal drip edge that overlapped the rough opening by an inch. The header didn't sit flush. We had to cut the drip edge back, which looked terrible, and then order a custom replacement header. That was a $290 mistake plus a one-week delay.
My checklist item here: Before you order, physically measure the installation environment. Not just the hole. Check for existing flashing, siding overlaps, trim build-out, and any non-standard details. If your window header needs to sit behind a piece of existing trim, you need that clearance measurement. If a porch post has to fit over an existing anchor bolt, you need that offset.
I also make a note: Can the piece be scribed to fit, or does it need to be exact? Some PVC can be cut, but the finish edge is key. Fypon products have a pre-finished surface—cutting them leaves a raw edge that needs sealing or painting. If you're gonna cut, plan for that step and add another 30 minutes per cut piece to your install timeline.
Step 2: Verify Load-Bearing Requirements (Even for Decorative Pieces)
I'm not a structural engineer, so I can't speak to actual load calculations. What I can tell you from a product-ordering perspective is that decorative and structural are not interchangeable categories. This sounds obvious, but I see contractors get this wrong all the time—especially with columns and brackets.
A Fypon column wrap is decorative. It goes over a structural post. A load-bearing column is a different product. I ordered 10 decorative fluted columns for a large porch in 2023. The spec sheet clearly said "non-structural," but I was in a rush and assumed the client's existing 4x4 posts would carry the load. They had 4x4s, but they were spaced 8 feet apart for a corner porch. The span was too wide for the deck to be supported by just those posts. We ended up having to hire a structural engineer to add steel posts inside the wraps. That cost the client $1,800 extra and my crew a full day of rework.
My checklist item: For every column, post, bracket, or gable bracket, ask: "Is this piece decorative, or does it need to carry weight?" If decorative, verify that the existing structure can carry the load independently. If structural, check the product's weight rating against your actual load. Fypon's load-bearing products will have specific engineering data—use it. I now keep a one-page spreadsheet that cross-references the product number with the intended load, and I won't process an order until I have that data.
Step 3: Budget for Shipping Damage and Unpacking Time
PVC is durable, but it isn't indestructible. Fypon ships millwork in boxes, and long pieces like beams and porch posts can get damaged in transit if they're not properly packed or if the freight handler is rough. This is not a knock on the brand—it's a reality of shipping 12-foot pieces of rigid material.
In September 2022, a shipment of 15 foot porch posts arrived. Two of them had a hairline crack running the length of the piece, right along a corner. It was barely visible but compromised the look. The problem was I didn't inspect them on delivery. I signed the bill of lading, and the delivery driver left. When we opened the boxes to install them a week later, we found the cracks. Filing a claim after the fact was a nightmare. We got partial credit, but it took three weeks to get replacements. The project was delayed, and the homeowner was not happy.
My checklist item: Factor in the cost of damage. I now estimate a 5-10% waste rate for large orders due to transit damage. I also add 30 minutes per box to the receiving time to do a proper inspection. And I always, always open the boxes and inspect each piece before signing the delivery receipt. Use a checklist for the inspection: check visible cracks, corner damage, surface nicks, and warping. If you find damage, note it on the delivery receipt, take photos, and call the supplier immediately. Don't assume a claim will be easy. It won't be.
Step 4: Match the Color and Profile Across Multiple Orders
This is a subtle one that catches people who order in phases. Fypon products come in a few color options (most are primed white or just primer-ready), but even within the same color, there can be minor batch variations. And if you're ordering matching trim, siding, and brackets over the course of a few months, those batches could differ slightly.
In October 2023, we installed gable brackets from one order and window headers from another order on the same house. They were both the same SKU and supposed to be the same color. But the brackets were from a production batch made in July, and the headers came from a batch made in September. The whites were slightly different—the headers had a warmer tone. It was barely noticeable in the showroom, but in direct sunlight, the mismatch was clear. The homeowner pointed it out within a week. We had to repaint the headers and brackets to match. That was a $150 cost in paint and labor, plus the embarrassment.
My checklist item: If the project requires multiple product types or if you're ordering in phases, order all the pieces from the same production batch. Ask your supplier for the batch number. If that's not possible, order a sample from each batch and compare them in the same lighting conditions you'll have on site. Or—better yet—just prime and paint everything yourself after installation. It adds two coats of paint and a day of drying time, but it guarantees a perfect match.
Step 5: Review the Hardware and Attachment Method
You'd think ordering a decorative bracket just means you get the bracket. Not always. Some Fypon pieces come with pre-drilled mounting holes. Some don't. Some require specific screws or adhesive. Some need blocking behind the siding to mount to. I learned this the hard way.
In December 2023, I ordered a set of Fypon gable brackets for a new construction house. The brackets were beautiful—heavy PVC, perfect detail. But they didn't come with mounting hardware, and the back of the bracket was a solid flat plane. There were no pilot holes, no slots. I assumed I'd just screw them through the bracket into the siding. But the siding was fiber cement, and the bracket was PVC. Screwing through the bracket without pilot holes caused the PVC to crack near the screw head on two brackets. And without pre-drilled holes, figuring out where to place the screws meant marking them by hand, which led to one screw being off-center. It looked unprofessional.
My checklist item: Before ordering, check the product specifications for attachment details. Does it come with mounting hardware? Pre-drilled holes? Installation instructions? And then verify that you have the correct fasteners and technique for your specific siding and substrate. For PVC trim and brackets on fiber cement or wood, use corrosion-resistant screws (like stainless or coated) with pilot holes that are slightly larger than the screw shank. For columns and wraps, check if they need a special adhesive or base plate. I now add a line item for fasteners and adhesives to every order. It's usually under $30, but it saves a lot of headaches.
One More Thing: The 'Stained Glass' Detail Trap
It's tempting to think you can just order a standard window header and call it done. But if you're working on a project with a stained glass window film, a custom door, or a non-standard opening, the simple approach won't work. I once ordered standard 36-inch window headers for a project where the homeowner had a stained glass film installed on the inside of the window. The film didn't affect the header size, but the framing behind it was slightly off because of the film's backing. The header didn't sit flush with the siding. It was a minor issue, but it cost me a day of rework because we had to pull the header and trim the siding back.
The lesson: if the project involves any secondary detail (stained glass, decorative films, custom sills, or specific window brands like Andersen or Pella), check the window and door specs from the manufacturer. Fypon headers are designed to work with standard framing. Non-standard details might need a custom solution.
Wrapping It Up: The Cost of Skipping These Checks
To be fair, not every order will go sideways. Most of the time, your Fypon order will arrive on time, look great, and install without a fuss. But I've tracked the cost of the mistakes I've made—the $890 for the wrong header, the $450 for mismatched colors, the $3,200 for the load-bearing fiasco, and hundreds more in smaller errors. Over the course of three years, poor ordering decisions cost my company about $6,800 in wasted materials, re-dos, and lost credibility with clients. That's the kind of cost that never appears on a material invoice. It's the total cost of ownership of a rushed ordering process.
That's why I use this checklist now. It takes maybe 20 minutes per order. But it has caught at least six potential errors in the last 18 months—errors that would have cost us time and money. I should add that this checklist doesn't cover everything. I'm not a logistics expert, so I can't speak to carrier optimization. And I don't know much about the structural engineering behind load-bearing posts. But from a material ordering perspective, these five checks have saved my bacon. Hopefully they save yours, too.